2023
Trenton PRV
![](https://newrhodesconstruction.com/wp-content/uploads/2024/07/90f8a0db-ba5c-432d-afc3-76025a09ec04.jpg)
![](https://newrhodesconstruction.com/wp-content/uploads/2024/07/573BD9C2-C053-44D8-AE59-27EE862B5C4E-Andree-McBoyle.jpeg)
![](https://newrhodesconstruction.com/wp-content/uploads/2024/07/9021F641-8C16-4DA7-84A5-432D85B4C4C2-Andrew-McBoyle.jpeg)
![](https://newrhodesconstruction.com/wp-content/uploads/2024/07/B7903340-30FE-4EEC-A275-5C8DED690B35-Andrew-McBoyle.jpeg)
![](https://newrhodesconstruction.com/wp-content/uploads/2024/07/90f8a0db-ba5c-432d-afc3-76025a09ec04.jpg)
![](https://newrhodesconstruction.com/wp-content/uploads/2024/07/573BD9C2-C053-44D8-AE59-27EE862B5C4E-Andree-McBoyle.jpeg)
![](https://newrhodesconstruction.com/wp-content/uploads/2024/07/9021F641-8C16-4DA7-84A5-432D85B4C4C2-Andrew-McBoyle.jpeg)
![](https://newrhodesconstruction.com/wp-content/uploads/2024/07/B7903340-30FE-4EEC-A275-5C8DED690B35-Andrew-McBoyle.jpeg)
We are proud to announce the successful completion of the PRV station project on Trenton Street in Port Coquitlam. The Trenton PRV station project showcased our innovative construction capabilities, particularly in managing the transition from the old PRV to the new system without service interruptions. This type of project is crucial in maintaining a stable water supply system, which is vital for both residential and commercial areas.
City of Port Coquitlam
![](https://newrhodesconstruction.com/wp-content/uploads/2024/07/573BD9C2-C053-44D8-AE59-27EE862B5C4E-Andree-McBoyle.jpeg)
Trenton PRV Station Project
This project, commissioned by the City of Port Coquitlam and overseen by consultant McElhanney, involved a comprehensive scope of work including the construction of an above ground PRV station, watermain upgrades, the abandonment of the old PRV station, and ditch infill.
Building a State-of-the-Art PRV Station
The construction process encompassed several key steps which included the installation of an above ground kiosk with separate electrical and mechanical sections, and the provision of underground power from a nearby power pole. Each phase was meticulously planned and executed to ensure a seamless integration of new infrastructure while maintaining operational continuity.